Clear Engineering Solutions Ltd

Office 66, 33 Great George Street, Leeds, LS1 3AJ
(17)
Chimney and Load bearing wall removal

Customer wanted to remove a chimney breast, only form the ground floor. Additionally two adjacent load bearing walls had to be removed. Three beams all together have been designed and optimised to save resources.